Foam Cement Insulation Wall Panel Line
Product Description
1.Production conditions
Model No. :HQWP-21
Equipment capacity(M3/day") :150~200
required plant():1500~2000
required venues():800~1000
water(T/day):35~40
electricity(degree/day):500~600
Labor required(person/shift):8~10
Cost of production(RMB/M3):90~110
Raw materials:Cement, fly ash, coal gangue and other industrial and agricultural wastes, Compound
2. Device parameter
Equipment Specifications(length×width×height m):57M*7.5M*5M
Equipment weight(T):28
Equipment power(KW):40
Product Description
1.Production conditions
Model No. :HQWP-21
Equipment capacity(M3/day") :150~200
required plant():1500~2000
required venues():800~1000
water(T/day):35~40
electricity(degree/day):500~600
Labor required(person/shift):8~10
Cost of production(RMB/M3):90~110
Raw materials:Cement, fly ash, coal gangue and other industrial and agricultural wastes, Compound
2. Device parameter
Equipment Specifications(length×width×height m):57M*7.5M*5M
Equipment weight(T):28
Equipment power(KW):40